Intel announced on Wednesday (November 18), during the TomorrowX Summit in Austin, Texas, that the Intel 18A process has signed its first external customer — and that yields on the process have reached 70%.
The announcement was made by CEO Lip-Bu Tan. The company did not disclose the customer's identity or the volumes and value of the deal, but the milestone is the first concrete sign that Intel's foundry is starting to attract third-party production.
What Intel announced
The customer signed up for the 18A-P node, a variant of the process that entered risk production in June, according to Intel technology chief Pushkar Ranade. The Intel 18A node combines RibbonFET gate-all-around transistors with PowerVia, a system that moves power delivery to the back of the chip.
The process was originally developed for Intel's own products, such as the Panther Lake processors. When Tan took over the company in March 2025, 18A yields were described as very low; reaching 70% is the progress the foundry needed to present itself as a commercial alternative.
Microsoft partnership and the next node
In the same presentation, Intel announced a partnership with Microsoft focused on Azure infrastructure using EMIB advanced packaging, a technology that connects several pieces of silicon inside a single package. The terms of the deal were not disclosed.
For the next node, 14A, Intel is keeping its target of launching the first internal product in late 2027, with external customers expected between 2028 and 2029. Until now, external customers had been steered toward 14A — which makes the 18A signing a change of course.
What is still unknown
Without the customer's identity, it is impossible to assess the size of the contract or what will be manufactured. In May, reports indicated that Apple and Intel were close to a foundry deal, but nothing has been confirmed since — and Intel gave no hint that would connect the two facts. The Apple information remains a rumor, not a fact.
The context helps explain the weight of the announcement: Intel has presented the Intel 18A process as central to its recovery after years of manufacturing delays, and Nova Lake, the first client product on 18A-P, had already been confirmed for CES. At SC26, the company also detailed Diamond Rapids, a Xeon with up to 256 cores. The first external customer shows the process is starting to be taken seriously outside Intel itself.
Image credit: Intel facilities in Chandler, Arizona, by neepster, CC BY-SA 2.0, via Wikimedia Commons.
Intel technology chief Pushkar Ranade confirmed on X that the customer signed up for the 18A-P node.
Sources
- Crypto Briefing — Intel signs first outside customer for 18A process as yields reach 70%
- Traders Union — Intel foundry signs first external 18A chip customer (com informações da CNBC)
- Coincu — Bitcoin ETF Outflows: US Session Roundup (corrobora o anúncio da Intel em 18 de novembro)
Transparency: this article was produced with the help of artificial intelligence, cross-checked against public posts on X and internet sources. The facts were verified in the sources listed above; please consult the original sources to confirm details.
By Muse